The new security system cable tie-ins to the plant security system are complete and tested allowing power/data to be provided to the new devices. Ameren performed the installation and terminations of all the new security devices. The high mast luminaire tie-ins are also complete and tested. Ameren also successfully performed the security diesel run time with the new panel loads. All cameras and microwave devices are installed, terminated and complete. The final acceptance test for all cameras and devices was successfully completed by Ameren’s security department. The new Protected Area (PA) and Nuisance fence tie-ins to the existing plant PA fence lines are complete. Ameren security department performed final inspections of the construction area which was expanded to become part of the existing PA. The HI-STORM UMAX Project has begun transitioning to the Pool-to-Pad Loading activities, with Dry Runs scheduled for May-June, 2015 and loading of the first 6 MPCs scheduled for July, 2015. Ameren Missouri is the owner and operator of Callaway Energy Center located near Reform, Missouri. Callaway consists of a 1284 MW Pressurized Water Reactor of the Standardized Nuclear Unit Power Plant System (SNUPPS) type design. The HI-STORM UMAX ISFSI provides a total of 48 CECs, with a capacity to store 37 spent fuel assemblies each, enabling storage of a total of 1776 spent fuel assemblies. |